国产人妻一区二区三区四区五区六-国产农村妇女高潮大叫-亚洲最大成人网色-99久久亚洲精品无码毛片-99久久国产露脸精品国产麻豆

Aluminum alloy heat treatment and quenching process

Date:2020-05-27

Aluminum alloy heat treatment and quenching process

1、Aluminum alloy heat treatment process。

The purpose of this process is to make a large amount of hardening elements that can be used, such as copper, magnesium, zinc, or polydissolved solids, into a solid melt, which must be kept at a high temperature of 535 degrees to 550 degrees for a long enough time. 8 hours, and obtain a more homogeneous solid solution. 1. Aluminum alloy solid solution temperature, aluminum alloy rim solid solution state point is 530 degrees, the melting point is 555 degrees, beyond this temperature begins to melt into aluminum water。

Main points of aluminum alloy heat treatment process:

A.When warming up, first turn on the windmill cooling water first, then turn on the windmill fully to set the operating temperature and combustion status

When entering the furnace (the casting is placed with the A side facing up, and the A side is forbidden (during solution treatment))

B.Solid solution aging treatment conditions 545 degrees * 8H + 130 degrees * 6H The temperature must be stable and uniform, according to the design strength of the rim、

Material, characteristics, testing decision。

C.The quenching water temperature is 60 degrees-80 degrees water temperature, the casting is not easy to deform, and the quenching time is counted from the door to

The uppermost casting is fully soaked in water, and the time is 16 seconds to 20 seconds to complete the instant quenching water。

D.Full inspection items after solution treatment, deformation inspection, reshaping, steel characters to prevent abnormal quality tracking, every time after aging

The hardness of one casting is measured on the upper and lower layers of the trolley, the value is 65-75HB. Cooperating with continuous automatic operation is the same as high temperature operation, enter the furnace after the furnace is pre-fired, and enter and exit the furnace regularly according to the time set by the timer。

2、Delaying process of aluminum alloy quenching water。

When quenching water, the casting is taken from the solution temperature in the furnace to the quenching water. The time it takes is the delay of quenching water. The delay of quenching water is 15 seconds> 18 seconds. The most commonly used quenching liquid is water, and the rest is air or liquid nitrogen, etc., but the stress and distortion caused by quenching should be considered. Sometimes hot water is needed to prevent deformation and cracking. 5. Precipitation hardening When heat-treatable aluminum alloy is quenched to normal temperature, due to the low solubility of solute at low temperature, it produces a saturated and unstable state, so some tissues will precipitate in the base, and the precipitation effect at room temperature is Natural aging, if it needs to be heated to a certain temperature, the precipitation is artificial aging。


分享
×
主站蜘蛛池模板: 亚洲中文字幕乱码电影| 亚洲美女综合一区| 丰满熟女视频一区二区| 一区二区精品视频日本| 日韩一区二区不卡影院| 精品人妻少妇一区二区三区影视| 国产毛片精彩一区二区| 中文一国产一无码一日韩| 久久av无码精品人妻系列| 久久精品66免费99精品| 在线无码av一区二区三区| 性色av免费观看| 国产人与zoxxxx另类| 国产av一区啪啪啪| 精品国产一区二区三区四区阿崩| 麻豆专媒体一区二区| 亚洲国产成人精品无码区在线软件| 用舌头去添高潮无码av在线观看| 成人片黄网站a毛片免费 | 国产下药迷倒白嫩美女网站| 精品国产一区二区三区国产区| 久久久成人精品av四区| 国精产品一区一区三区有限公司杨 | 国产免费啪嗒啪嗒视频看看| 国产精品一区二区三区四区久久| 极品美女一区免费视频| 中文字幕人妻一区二区| 亚欧成人中文字幕一区| 无码少妇一区二区三区芒果 | 亚洲中文字幕无码久久| 99久久精品免费看国产| 亚洲精品久久久久玩吗| 黄色一区二区三区四区| 久久久久免费看黄a片app| 色五月丁香五月综合五月| 精品无人国产偷自产在线| 日韩性爱视频| 国产传媒一区二区三区呀| 亚洲日韩va在线视频| 2020年最新国产精品正在播放| 亚洲国产一区二区三区四区电影网 |